AUSTRALIA

Installation at Saint-Gobain Factory

Installation at Saint-Gobain Factory

A wide range of lifeline solutions and fixation assemblies are set up on the production site to secure the roof and access ladders.

Printable verison with more photos

Brief

As specialist, Fallprotec offers one stop shop services as well as key in hand solutions to its industrial customers. 4 different integrated solutions: SafeLadder, SecuRope on hot deck, SecuRope and anchor point on cold deck.

Installed products

  • 12m of SafeLadder with exit to access the roof
  • 200m of SecuRope lifeline on cold deck roof
  • 150m of SecuRope lifeline on hot deck roof
  • 4 anchor points LDV029 to avoid the pendulum effect

Geolocation

Installation at Saint-Gobain Factory

Góra Kalwaria, Poland