Fallprotec installed a Climbing SafeAccess solution to facilitate the cleaning and maintenance of the interior façades and of the sloped atrium.
Printable verison with more photosThe 140 West Street building is a complex of two towers joined together by a clear glass atrium. To blend in the architectural concept, the rail is powder coated the same colour than the steel structure. The battery-powered trolley enables the rope access technicians to move along the façade. Securail abseiling rails are integrated into the atrium to reach each point of the glass ceiling.
Installed products
Kyle Hatcher
Vice President USA